Shoemaker Gas Turbine Facility

About the Project
The Shoemaker Gas Turbine is a peak generating station. Peak generating stations generally run when there is a high electrical demand. The Shoemaker Gas Turbine operates within Orange and Rockland’s Middletown operations center. The applicant proposes to add a water injection air pollution control system to control oxides of nitrogen (NOx) emissions at the Shoemaker Gas Turbine Facility. In addition, the facility will use only natural gas during the ozone season to meet the regulatory requirements of 6 NYCRR Subpart 227-3. The proposed Shoemaker facility will maintain its current limit on operating hours, as well as commit to limiting carbon monoxide (CO) and NOx emissions in order to comply with state regulatory requirements implemented for the safety of the surrounding communities.
Documents
Click to view the below documents.
Draft Public Participation Plan
Public Meeting Presentation Slides
Contact Information
Greg Sharland
Alliance NYGT, LLC
110 East Seneca Street
Sherrill, NY 13461
Phone: (585) 343-6006 | Email: gsharland@aeny.us
John Trendowski
C&S Engineers, Inc.
499 Col. Eileen Collins Boulevard
Syracuse, NY 13212
Phone: (315) 455-2000 | Email: jtrendowski@cscos.com