Sound insulation management of up to 700 residential structures
Pavement reconstruction of 3,500 linear feet of Taxiway Y and the reconstruction of portions of several taxiways and connectors
Award winning runway extension and the first airfield project in the U.S. to receive an Envision Gold Award
Design and construction of the Fit & Rec Center at 3Roots in San Diego, California
25,000-square-foot addition of the existing middle school, consisting of a new cafeteria with a new kitchen and serving area
General contractor for construction of the a new laundry facility, also providing process equipment design and installation
Process piping and millwright services for the installation of digester tanks at the Cayuga Regional Digester Facility
2.3-mile-long pavement rehabilitation and full depth shoulder widening project in Monroe County, NY
284-unit affordable housing development in Southern California
Electrical charging infrastructure to allow for electric ground support equipment at San Antonio International Airport
Vehicle and equipment electrification strategic plan for Philadelphia International Airport
Full energy audit and cost-effective energy conservation measures (ECMs)
Enhancement of the Salt Lake City International Airport's greenhouse gas (GHG) tracking and reporting process
On-call environmental and sustainability consulting services for the San Diego International Airport
On-call planning services for the Portland International Airport
On-call sustainability services agreement serving two Philadelphia airports
On-call planning services agreement serving two Philadelphia airports
Preparation of simultaneous master plans, establishing a long-term vision and roadmap for two general aviation facilities in San Diego, California
Airport master plan update to create a flexible 25-year development plan and program for the Lehigh Valley International Airport
Norwich City School District initiated a campus-wide adaptive LED lighting project
Sustainability leadership and Envision administration efforts for a runway strengthening and enhancement project at Indianapolis International Airport
Full service tenant improvement for a BurgerFi restaurant at Jacksonville International Airport
Energy efficiency improvement project for the Cortland Enlarged City School District
Design and implementation of a campus-wide energy efficiency project for the Victor Central School District
New multi-modal transportation center to serve the airport by taxi and bus service
Construction management for the stadium improvements to NBT Bank Stadium, home of the New York Mets
Construction management for the $12.8 million capital improvement project to upgrade Wellsville Central School District’s facilities
Construction management for McGraw Central School District's $9 million Capital Improvement Project
8,000-square-foot renovation of the STEAM learning center at Groton Jr.-Sr. High School
Construction management for a $14.2 million Capital Improvement Project as well as an Energy Performance Project at Rome City School District
A campus-wide site electrical distribution system upgrade to replace SUNY Cortland’s aging system
Construction management for Marcellus Central School District's $8 million Capital Improvement Project
Construction management for extensive interior and exterior renovations at all Hancock Central School District facilities
Transportation system inventory, analysis, and plan development for improving community mobility
Overall assessment of underground utilities campus-wide at SUNY Cobleskill
Engineering design and cost benefit analyses to help identify the most appropriate steps to achieve redevelopment
Parking study that provided strategies to address existing and anticipated parking and transportation issues
Civil engineering services for a 20,000-square foot Vons Grocery Store on Catalina Island
Planning, design and construction administration for major utility, infrastructure, and site improvements
Design and construction of a new 22,000-square-foot higher education facility
Comprehensive reuse plan for Phoenix Sky Harbor International Airport
Detailed market assessment and implementation strategy for development of the 350-acre airport-owned South Development Area
Airport master plan and airport layout plan development to provide a vision for the next 20+ years of development at T.F. Green Airport
Identification of appropriate redevelopment strategies for two study areas (East End and Northern Neighborhood) within the city
Redevelopment of the Former ANSCO Camera Factory, located along Emma Street in Binghamton, New York
Implementation assistance for a U.S. Environmental Protection Agency brownfield assessment grant in Jamestown, NY
Site remediation and $240 million redevelopment of the “Webster Block” in Buffalo, New York
Generic Environmental Impact Statement development support
Acquisition and redevelopment assistance for the Mentholatum building—used for the manufacture of menthol-based health and beauty products
Pre-nomination study as part of the New York State Department of State Brownfield Opportunity Area (BOA) Program
Identification of appropriate redevelopment and cohesive revitalization strategies for six municipalities along the Oswegatchie River
Design of a new LEED Silver visitor center/administration facility for the U.S. Fish & Wildlife Service
Heating, cooling, and building envelope improvements to convert the building to a year-round regional destination
Interior renovation to improve function and aesthetics and upgrade to HVAC, plumbing, life safety and electrical systems
Architectural, structural, and electrical engineering design for the renovation of approximately 11,900 square feet of University Hospital’s lobby
Renovation of interior spaces at the Abundant Life Christian Center
Architectural, interior, and corresponding mechanical and electrical design for an arena lounge
Design and construction management of a new 14,000-square-foot ARFF/snow removal equipment facility
Design and construction administration services for the interior renovation
Full interior design service for a 26,000 square foot multi-purpose facility
New layout for the multi-ramp Exit 16 A-B-C at I-390 with East and West Henrietta roads
Development of a former railroad right-of-way into a mixed-use, off-road trail
Design phase (I-VI) services for rehabilitation of the 69-foot, single-span Dickerson Street Bridge
Complete replacement of Pineville Bridge (CR48) over the Salmon River
Wildcat Road bridge over Wildcat Gully historic bridge replacement
Roadway, safety, and security enhancement study
Design phases I-VI for the $1.2 million replacement of River Road (CR 96) over the NYS&W Railway
Installation of over-width sidewalks, redesign of parking, improved crosswalks and signage, and enhanced pedestrian-level lighting for the Village of Bemus Point
Prime design consultant for the Creekwalk, a 2.2-mile trail through downtown Syracuse
$4.5 million rehabilitation of Genesee Street in the City of Auburn between Bluefield Road and North/South Street
Design Phases I-VI for a locally administered federally aided bridge replacement project
Program management services for the development of a new county-wide emergency communication system
Network development support services for approximately 500 new sites for Verizon since 2013
Replacement of a 3,200-ton back-pressure steam chiller equipped with eight 300hp magnetic-bearing compressors
Structural design of a new, 1.8 million-square-foot airport terminal and auxiliary buildings
BIM services along with engineering, architecture, and construction management for the Syracuse Hancock International Airport
New behavioral health facility for Delaware County
New regional highway department maintenance facility to replace a building that has reached its useful life
34,188-square-foot cultivation facility built from the ground up for New Green Acres
Owner representation for Landmark Theaters cinema renovation
Design build of a new 9.4-acre private development project for Coast Flight
Planning, design, and construction management of Jet Center Los Angeles (Northside hangars)
Engineering design and construction of our own San Diego office 10,000-square-foot expansion
3,800-square-foot renovation for a clinical outpatient space and 1,460-square-foot office for support staff
Design, management, and construction of a 25,000-square-foot fabrication and warehouse facility
Abatement of pipe insulation/pipe fittings, complete removal of existing finishes, partitions, and ceilings for a medical facility
Replacement/rehabilitation of existing passenger boarding bridges for the Albany International Airport
Real estate advisory services to address opportunities and constraints associated with the Canaveral Port Authority commercial spaces
Preliminary engineering services, wetland permitting, detailed design, and construction services for EJ facility expansion
Architectural and engineering design for the phased development of storage facilities and a new parking area
Design services for various SUNY Campuses including energy, plumbing, planning, landscaping, construction, architecture, and more
Complete redesign and renovation of plant floor spaces, electrical, and mechanical system infrastructure for a manufacturing facility
New 60,000-square-foot office and production printing facility for Syracuse Label
Engineering design and construction of an 18,500-square-foot ISO 7, Class 10,000 cleanroom and MEP design of a 40,000-square-foot product warehouse
Lab renovation for Garlock Sealing Technologies that included demolition, additional underlab facilities, HVAC framing, and lab equipment installation
Design-build of a 100,000-square-foot addition to G.A Braun’s existing manufacturing facility
$2.8 million Auburn Junior High School and Holland Stadium improvements
5,100-square-foot general aviation terminal, 150,000-square-foot PCC apron, access road, site improvements, and lighting for March Inland Port
$8.7 million LEED Gold receiving and distribution center (RDC) at San Diego International Airport developed through a public-private partnership
Award winning, $3.5 million runway rehabilitation at Ithaca Tompkins International Airport
Overall program management of airside, landside, and terminal development projects at Syracuse Hancock International Airport
Energy efficiency study of the four largest buildings at Lockheed Martin’s Liverpool facility
New, centralized maintenance facility that will house disparate functions of the maintenance forces across the park
Blighted, unused area turned into a destination spot
350,000-square-foot, $110 million medical facility with LEED Platinum Certification
Park Place Residential Development, 559 dwelling units
268 acre Master Planned Community in Temecula Valley
Runway incursion mitigation project to address hotspot concerns at Orlando Executive Airport
Existing communications system improvements to a trunked land mobile radio network (TLMR)
Sustainable addition and renovation of the 43,000-square-foot core of Building 100 at Griffiss International Airport
Award-winning, landmark $45 million renovation and upgrade to Syracuse Hancock International Airport’s passenger terminal
New terminal building, FIS facility, and multi-purpose space at Griffiss International Airport
$9.7 million interior terminal amenities renovation and modernization at Albany International Airport
Reconstruction of the Donovan Hall plaza and existing pedestrian bridge at the SUNY Polytechnic Institute campus
Design of new turf field and supporting facilities (accessible walkways, fencing, lighting, scoreboards, and game clocks)
6,000-square-foot renovation to relocate the existing Lake Effect Café and 24-hour study lounge at Penfield Library
Energy master planning study as part of NYSERDA’s PON 3438 - REV Campus Challenge Technical Assistance for Roadmaps
New 33,000-square-foot building for the Dutchess Community College Aviation Education Program located at Hudson Valley Regional Airport
Storm drain and electrical infrastructure assessments of existing conditions as part of an underground utility systems survey
Full architectural, mechanical, plumbing, electrical, and life safety design for the new clinic spaces
Full service laboratory renovations at Roswell Cancer Cell Center
Structural and MEP engineering for a modular medical space
Full service architecture and engineering for outpatient clinic renovation
Civil design, safety phasing, and construction inspection of a complete rehabilitation of Runway 4L/22R and its associated taxiways
Civil design, safety phasing, and construction inspection of a complete rehabilitation of a runway and its associated taxiways
$20 million terminal expansion and renovation at Ithaca Tompkins International Airport
150,000-square foot expansion and renovation of Orlando International Airport's Airside 4 terminal
Award winning, $50 million multi-phased terminal apron reconstruction and expansion project
Major restaurant renovation and expansion entailing a full kitchen renovation and doubling of the restaurant’s seating capacity
Full-service design of 25,000-square-foot immersive, space themed theatrical dining restaurant located at a local theme park
Food service design and renovation of four Starbucks locations within the Walt Disney World Resort’s major theme parks
Complete interior fit-out renovation and exterior alterations for a themed restaurant and retail establishment
Major renovation of a 47,000-square-foot lobby/restaurant “main building” and new 8,400-square-foot detached restaurant
Facility engineering design of a new 190,000-square-foot cruise terminal with the capacity to process 6,000+ passengers
Conversion of a 40,000-square-foot abandoned building into a fully automated, state-of-the-art malting facility
Accessibility Tools