2.3-mile-long pavement rehabilitation and full depth shoulder widening project in Monroe County, NY
Transportation system inventory, analysis, and plan development for improving community mobility
New layout for the multi-ramp Exit 16 A-B-C at I-390 with East and West Henrietta roads
Development of a former railroad right-of-way into a mixed-use, off-road trail
Design phase (I-VI) services for rehabilitation of the 69-foot, single-span Dickerson Street Bridge
Complete replacement of Pineville Bridge (CR48) over the Salmon River
Wildcat Road bridge over Wildcat Gully historic bridge replacement
Roadway, safety, and security enhancement study
Design phases I-VI for the $1.2 million replacement of River Road (CR 96) over the NYS&W Railway
Installation of over-width sidewalks, redesign of parking, improved crosswalks and signage, and enhanced pedestrian-level lighting for the Village of Bemus Point
Prime design consultant for the Creekwalk, a 2.2-mile trail through downtown Syracuse
$4.5 million rehabilitation of Genesee Street in the City of Auburn between Bluefield Road and North/South Street
Design Phases I-VI for a locally administered federally aided bridge replacement project